Projects
Explore our Project Showcase page to see some of the exceptional work our construction company has delivered across a variety of projects, from large-scale pipeline installations to specialized infrastructure solutions. Each project highlights our commitment to quality, safety, and innovation, demonstrating why we’ve been trusted industry leaders since 1979.
CAL PINE ENERGY
The South Point Meter Station Upgrade project involves the installation of new natural gas metering equipment, a filter-separator skid, and associated infrastructure at the Kinder Morgan Meter Station in Fort Mojave, Arizona. The scope includes excavation, foundation work, equipment setting, piping fabrication and tie-ins, hydrotesting, and coating applications. Additional responsibilities include ensuring compliance with environmental and safety regulations, managing materials, and maintaining site security. The contractor is tasked with delivering a fully operational and compliant facility while adhering to all project specifications and timelines.
COM-QUEEN CREEK
COM-WARNER
The scope of work for the 8-6″ HP Gas Line Warner S Project includes the installation of an 8-inch and 6-inch high-pressure welded gas line, along with associated fittings such as elbows, reducers, valves, and tees. The subcontractor is responsible for all labor, materials, equipment, and supervision required to complete the job, which involves excavation, welding, testing, backfilling, and site restoration. The project also includes traffic control measures, dust control, and proper disposal of construction debris
GBGTC
Installed approximately 107,620 feet of 16-inch transmission steel pipe, coated, 0.250” wall thickness, X-65, double random lengths. Installed a new valve assembly and tie-in to existing inlet pipe at the Jungo Road Valve Assembly.
SoCal GAS WOODLAKE
The Woodlake Pressure Betterment project involves installing approximately 24,400 feet of 8-inch steel pipeline across two phases to improve pressure management in the area. Phase 1 covers about 14,200 feet of pipeline, while Phase 2 includes 10,200 feet, along with associated paving and restoration work. As the contractor, we managed excavation, trenching, backfill, coating, and testing of the pipeline, ensuring compliance with all safety and environmental standards.
KERN RIVER INTERCONNECT
Install Odorization Skid, High Pressure Regulator Station and Two (2) Metering Stations. Concrete Foundations, Pipe Supports and Shade Structure.